COSMIC Examples – What could they mean as an IT project?

Dumke, R., Fiegler, A., Wille, C.

This paper uses the software sizing of the COSMIC examples (see
https://cosmic-sizing.org/publication-cat/case-studies/ ) in order to show some “fictive”
estimation of typical project control data and metrics. We use the size measurement
of COSMIC Function Points as CFP described in the different examples.
Furthermore, the estimations of the essential project data are based on our
SoftwareExpert App (available in the Google Play Store). The estimation could be
selected from a list of authors for a special kind of project metrics or you can use all
shown metrics building the average values. In our paper we have chosen the average
metrics values (the project costs excluded).