COSMIC Function Point sizes far superior to Story Points for predicting effort

Abran, A., Demirors, O., Symons, C.R.

Studies in four different organizations developing different types of software show conclusively that sizes of sprints or iterations measured using COSMIC Function Points (CFPs) correlate with effort much better than do Story Points (SP’s). This means that CFP sizes should be much better for estimating Agile activities than using SPs.

Publishing date
14-11-2017
Download option
Allow direct download

Download

Studies in four different organizations developing different types of software show conclusively that sizes of sprints or iterations measured using COSMIC Function Points (CFPs) correlate with effort much better than do Story Points (SP’s). This means that CFP sizes should be much better for estimating Agile activities than using SPs.