The paper ‘Effort Estimation with Story Points and COSMIC Function Points – An Industry Case Study’ reports on the performance of estimation models built using Story Points and COSMIC Function Points and shows that, for the organization in which the data was collected, the use of COSMIC Function Points leads to estimation models with much smaller variances. The study also demonstrates that the use of COSMIC Function Points allows objective comparison of productivity across tasks within a Scrum environment.